Site Handover ceremony for expansion and refurbishment of Kiwoko hospital operating theatre
Removal of existing structures; Chain link fence
Construction of masonry walls
New theatre extension building in Kiwoko Hospital
Steel Reinforcements-Buwate-Udrain, May 2023
Finished U-drain base, May 2023
Formwork for U-drain walls, May 2023
Completed U-drain section with covers, May 2023
Construction Of Stone Masonry Wall-Entebbe Outflow Channel, October 2023
Completed Section Of Entebbe Outflow Channel, October 2023
Excavation For Stone Pitched Drainage Channel, July 2022
Construction Of Stone Masonry Wall Soroti Drainage, July 2022
Excavation For Stone Pitched Drainage Channel-Mubende, September 2023
Completed Section- Mubende Stone Pitching, September 2023
Prepared Section For Laying Stones, April 2020
Laying of Stones for Protecting Against Erosion, April 2020
Stone Work To Protect Against Erosion On The Embankment For The Box Culvert In Kayunga, April 2020
Fabricated Reinforcement For Soroti Manholes, May 2021
Cast Manhole Base, May 2021
Formwork For Soroti Manhole Walls, May 2021
Concrete base for cross culvert
Encasing cross culvert with concrete
Testing of the backfill layer for culverts
Backfilling of longitudinal culverts
Residential house extention for Mr Niinye Francis in Makindye Division Kampala
Renovated male ward at Kiwoko Hospital
Classroom modified into a dormitory at St Denis Ssebugwawo SS, Ggaba